Universal subsoiler (working depth up to 65cm)

Standard equipment

• 3-point linkage cat. II and III
• Working depth up to 65cm
• Clearance under the frame: 82cm, space between tines 45cm
• Tine thickness: 40mm with hardened front surface
• Tempered replecable points
• Drainage cone mounted to the tines with the chain
• Shear bolt protection
• Supporting leg

Optional equipment

• Tandem spike roller with hydraulic depth adjustment

Product number
8296;8297;8298;8299

Description

Ref.No.Working width [m]Number of tines [pcs.]Power demand [HP]Weight [kg]
82960,93102695
82971,85150980
82982,772501230
82993,693501480